How to request an SDG&E panel upgrade
How do I request a panel upgrade from SDG&E?
Your electrician runs a load calculation, then applies for a change to existing service in SDG&E's My Project Center. SDG&E says to allow about 2 weeks for review; a planner may visit, then issues a work order. On install day SDG&E disconnects, the City inspects the new panel and SDG&E reconnects, ideally the same day. Same-amp replacements usually skip the service request.
Steps
- Load calculation by a C-10 electrician.
- Apply in SDG&E My Project Center (owner, applicant, loads, photos).
- SDG&E review (about 2 weeks) and possible field visit.
- Pay utility fees, pull City electrical permit.
- Schedule same-day disconnect, City inspection and reconnect.
Faster path
SDG&E's Express Program covers residential projects up to 400A with no added load, a clear 3×3 ft workspace and no underground relocation.
Underground upgrades · Upgrade vs subpanel
Talk to vetted local pros
Questions San Diego homeowners ask
How long does an SDG&E service upgrade take?
SDG&E asks for about 2 weeks for application review; total time depends on field work and whether lines are overhead or underground.
Who files the request?
Usually your electrician, with the homeowner listed as property owner.